The only issue at present is what seems to be the always present water leak! We've had Southern Water to site on about 3 occasions, each time I call I'm told that the leak has been fixed, whilst our groundwork team tell us otherwise. The key problem is that it's the old property's water main - a nice old fashioned metal pipe with no locatable stop-cock. As the "nice" SW representative told me on the phone, we are responsible for the pipework our side of the stop-cock, so I kindly informed him that SW were therefore obliged to tell us where said stop-cock was located!
Luckily, whilst Keri was on site taking the photo's below, an Engineer turned up. Initially they thought it was a faulty valve, replaced that and still the leak persisted. Next up was a radio tracker, whereby they tracked the pipe to our boundary and then picked it up again at the roadside - I'm convinced the original stop-cock is located in the garden of what is now the new property built in front (completed in 2007). Anyway, the upshot is that SW are going to excavated where they picked it up by the roadside and finally fix it.
In the meantime, the first lot of below DPC materials have been delivered to site and, as I write this post, the brick layers should be getting on with the blocks you see in the photo.

The Signage by the road on entrance to site - a nice mock-up of how the house will eventually look.

The first delivery of blocks to site... not quite an action photo :o)
No comments:
Post a Comment